Welcome to the official website of Shanghai Yiyuan Construction Engineering Co., Ltd!

Focus on tailoring for customers

Direct sales, customized on demand, lifetime warranty

全国咨询热线

021-61637237


新闻banner

Information

Product classification

News and information

Hot keywords

contact us

Shanghai Yiyuan Construction Engineering Co., Ltd.



Contact: Qian Lisheng


Telephone: 021-61637237


Biography: 021-54303786


Hand machine: 13761167936


Mail box: zbhqls@163.com


Website: www.sh-yyjz.com


Address: No. 27, Lane 5288, Hunan Road, Hangtou Town, Pudong New Area, Shanghai



Do you know the installation steps of air conditioner

Your current location: HOME >> News >> Knowledge guide

Do you know the installation steps of air conditioner

Date of issue:2018-12-03 00:00 Source:http://www.sh-yyjz.com Click:

1. The internal machine is in place

The first step when the construction team enters the field is to hoist the internal machine. There are two points to note here. Air conditioning repair

①The distance between the internal machine and the roof should not be less than 1 cm to avoid resonance with the wall when the machine is running. Shanghai Central Air Conditioning Project

②The internal machine must be hoisted and placed in a horizontal position. After installation, a special tool must be used to measure whether the machine is level.


2. Installation of refrigerant copper pipe

After installing the internal unit, you can install the refrigerant copper pipe, which is an important part of the central air-conditioning installation process. Shanghai air conditioning design


3.Fill nitrogen to maintain pressure

This is a pressure test that must be performed on the copper pipe after the welding is completed. A certain pressure of nitrogen is filled into the copper pipe to maintain the pressure. The general pressure test time is 24 hours.


4. Installation of condensate pipe

After connecting the condensate pipe from the internal unit to the outdoor or floor drain, maintain at least a slope of >1%. The higher quality installation is to connect from the indoor unit, land nearby, and then connect to the outdoor or floor drain together with other condensate pipes.


5. Install the outside machine

Make sure that the air outlet of the outdoor machine fan must be within 50 cm and 15 cm behind the outside machine without obstructions, and all floor feet must be equipped with shock-absorbing blocks to ensure the normal operation of the outdoor machine.


    

上海中央空调工程安装

Related labels:空调维保,上海中央空调工程,暖通设计

Recent browsing:

Bottom link

Contact: Qian Lisheng

Mobile phone: 13761167936

Telephone: 021-61637237

Mailbox: zbhqls@163.com

Address: No. 27, Lane 5288, Hunan Road, Hangtou Town, Pudong New Area, Shanghai


Scan QR code

暖通系统   空调安装

Copyright ©http://www.sh-yyjz.com/en/ Shanghai Yiyuan Construction Engineering Co., Ltd. Specializing in,Welcome to inquire!
Shanghai ICP No. 16032630-1  Powered by Clouds platform  Technical Support:Xiangyun Platform
Online Service
share