Welcome to the official website of Shanghai Yiyuan Construction Engineering Co., Ltd!

Focus on tailoring for customers

Direct sales, customized on demand, lifetime warranty

全国咨询热线

021-61637237


新闻banner

Information

Product classification

News and information

Hot keywords

contact us

Shanghai Yiyuan Construction Engineering Co., Ltd.



Contact: Qian Lisheng


Telephone: 021-61637237


Biography: 021-54303786


Hand machine: 13761167936


Mail box: zbhqls@163.com


Website: www.sh-yyjz.com


Address: No. 27, Lane 5288, Hunan Road, Hangtou Town, Pudong New Area, Shanghai



How is the central air-conditioning water system piping and installed?

Your current location: HOME >> News >> Industry information

How is the central air-conditioning water system piping and installed?

Date of issue:2019-09-18 00:00 Source:http://www.sh-yyjz.com Click:

In kindergartens, commercial office buildings, office buildings, shopping malls and other large places, the central air-conditioning of the water system is more affected. Then, how to pipe and install the central air-conditioning water system? I believe many people are more curious. Next, the editor of Shanghai Air Conditioning Design Company will explain it to you!


1. Piping method: The piping of the central air-conditioning water system is to select the corresponding pipe diameter according to the piping size given by the unit and the cooling capacity of the unit, and connect to the inlet and outlet pipes of the unit respectively.


    

    

    

上海中央空调工程

    

    

    

  

2. Air conditioner maintenance tells you the main points of installation

One: Try to avoid air staying in the pipeline, and install an automatic drain valve at the height of the water supply pipe to make the water in the pipe flow smoothly to reduce the resistance loss of the system.

Two: A water filter is installed at the water inlet pipe of the unit. The filter is 60 meshes, which can filter general sundries and prevent the plate heat exchanger in the unit from clogging and causing damage to the unit.

Three: The water supply solenoid valve and shut-off valve of the water system should be installed in the user's room to avoid freezing and cracking of the water supply pipe and valve during use in winter


3. Sewage treatment: After the piping of the water system is installed, a hydraulic test and sewage treatment should be carried out. Clean the embroidering residue and dirt mixed into the system to ensure that the pipeline is unblocked!


    

Related labels:暖通系统,中央空调工程,空调维保

Recent browsing:

Bottom link

Contact: Qian Lisheng

Mobile phone: 13761167936

Telephone: 021-61637237

Mailbox: zbhqls@163.com

Address: No. 27, Lane 5288, Hunan Road, Hangtou Town, Pudong New Area, Shanghai


Scan QR code

暖通系统   空调安装

Copyright ©http://www.sh-yyjz.com/en/ Shanghai Yiyuan Construction Engineering Co., Ltd. Specializing in,Welcome to inquire!
Shanghai ICP No. 16032630-1  Powered by Clouds platform  Technical Support:Xiangyun Platform
Online Service
share